RUIRU PROJECT From Diaspora Client

1.Roles we involved during construction and after

We came into the site in March 2021.

By this time the superstructure was about to be completed. Finishes had not commenced

Role During construction: Worked as project managers

To advise on

  • Advised on changes to shift some units into different products that would be more ideal in terms of returns
  • Advised on changes in interior design of each unit – This allowed maximization of space
  • Advised on introduction of more amenities and implemented the same
  • Advised on best cost-effective products for finishes without compromising quality
  • Supervised the works of each sub-contractor in the finishes stage
  • Guided the procurement processes and reporting to allow prudent/efficiency. Costs were lowered significantly and losses reduced.

2.Projected returns after completion

Not sure this information needs to be shared publicly till client gives consent

3.Project Facilities

This project consists of studio units, 1 bedroom units, 2 Bedroom units and a 3 bedroom unit. This allows for different needs of clients

Amenities include

  • Internet connectivity
  • DSTV connectivity from a centralized aerial that supplies signals to all units
  • CCTV coverage of all common areas to manage security
  • Provision of sufficient water storage capacity
  • Secure Parking space that is well maintained.